Hi!
If there are non-protected VMs running in a DR site and a recovery action is initiated from PROD to DR, will SRM prioritize to power on the configured protected VMs and will shutdown the non-protected VMs to accommodate resources?
What if there are enough resources in the DR site?
What if the resources in the DR site is enough to accommodate the protected VMs?