Scenario:
Recovery Plan 1: APP1, DB1, WEB1
Recovery Plan 2: APP2, DB2, WEB2
SRM can do datacenter migration/disaster avoidance:
1. If failover is initiated, PROD VMs do a last replication, power down PROD VMs and power on DR VMs?
2. If Recovery Plan 1 is initiated failover, VMs in the Recovery Plan 2 will not be affected right. same if recovery Plan 2 is initiated?
3. Will SRM stop the replication of Recovery Plan 1 VMs (vSphere Replication/Array Based Replication) only and not the Recovery Plan 2 VMs (Recovery Plan 2 VMs replication ongoing)?
4. If Recovery Plan 1 VMs are powered on the DR site and reprotect is initiated for this recovery, only Recovery Plan VMs 1 will be replicating now from DR to PROD without affecting the PROD to DR replication of Recovery Plan 2 VMs?