During a DR test, a site failover was executed. While running VMs at the recovery site, new port groups were added within ESXi and VMs were moved on to the new ESXi standard switch port groups. Afterward, the failback operation was unsuccessful and VMs now show as only placeholders in both sites.
Could this addition of new port groups partway through the process be contributing to the issue?