I'm in the process of breaking out Embedded PSCs to External PSCs.
I have a question regarding the SRM configuration.
At present the VC is pointing to it's Embedded PSC, SRM is pointing to the vCenter & its Embedded PSC.
I have deployed an external PSC as a replication partner with the embedded PSC, is it possible to now repoint SRM to the external PSC BEFORE repointing the vCenter to the external PSC or is it a requirement that SRM uses the same PSC as the vCenter?
Ideally i'd like to removal all external reliance on the embedded PSC before re-pointing the VC to the external PSC and retiring the embedded PSC.