Hi,
I did the SRM training, but it does not show the configuration and failback steps.
I researched and found some blog and managed to do the setup.
However, I'm stuck in the step-by-step to make a correct failback in a (primary) drop-off scenario.
I simulated the (Vphere, Vcsa, Srm and Storage) shutdown of the primary site and run the recovery plan on the DR site successfully.
I noted: LUNS appear with a SNAP nomenclature, with says in training. But when I do the failback, it will be strange.
Now I want to connect the servers (Vphere, Vcsa, Srm and Storage) of the primary site again, to do the reprotection.
In this scenario I think it would be a basic procedure, the steps below:
1 - Remove (Rescan) Vsphere LUNs from the primary site;
2 - Remove VMs from Vsphere inventory;
3 - Failback of storage LUNs;
In SRM I would have to reconfigure the direction of (Save> Master).
But the plan is with DR running, can I use it by the protection group to enable reprotection?
Or is it better to create a new protection plan?
Thank you.