Hi Folks, I am planning an SRM recovery (as opposed to Test). Does anyone know if it is possible to use manual tasks to revert back to normal production after "recovery" is complete? I don't want to have to perform a "Reprotect" and "Failback" because I don't want to replicate any data from the recovery site back to Production Site at any time during the planned recovery. I simply want my Production Site back to normal like it would be after running a "Test" cleanup. If it is possible what are the manual tasks to re-establish SRM Protection again from the Protected Site to the Recovery Site? I am using SRM5.0 and EMC Recover Point for replication and my SRA adapters are Version 2. Everything I read indicates I have to reprotect and failback.....
Thanks in advance to anyone who has the answer...