I'm scheduled to run a planned recovery on our Production servers this coming weekend. We will do a recovery, testing and then reprotect and fail back.
I've been through this with a group of development and test servers and it has gone well. The one question I have is about the site to site resource mappings, such as folder and network.
I have these defined from the protected site to the recovery site. In my testing with development servers it doesn't appear that creating mappings are needed from the recovery site to the protected site when doing a failback.
My assumption is that these are not needed as long as they are defined the other way. Is this correct?
Any other pointers about doing a test recovery are also appreciated.