I didn't find a clear answer in the documentation, so hence a question.
I'm planning a complete new DR site.
Can I install a new clean VC, SRM (5.1.3) etc. and simply break the connection to the old dr site and connect to the new one ?
Will this retain the existing recovery plan ?
It will be using the same SAN replication source with a new SAN target.
I did consider moving the old vCentre host, but renaming it looks to be an issue.
Thanks,