I have a VMware 5.1, vcenter 5.1 insfrasturcure at both primary and DR site. I have replicate 12 VMs to DR site using SRM 5.1. But two VMs not show the "last sync completed" and "last sync duration". Please see the image I have attached. What is the reason for this and How can I resolve it?
↧