If you shut down the SRM server at a Protected Site, will you still be able to initiate a Recovery Plan / Failover on the Recovery Site? Assume that replication of data (EMC RecoverPoint in this case) is still running between the Protected and Recovery Sites.
Further, if a net new SRM server is configured at the Protected Site and paired with a different Recovery Site (different data center altogether), will there be any issues?
Thanks,
-Brian